From plans to permit, explained.

Permitting is where most Southern California projects stall. Here is the path a project takes through our office — and why keeping survey, engineering, and drafting under one roof shortens it.

  1. 01

    Survey & documentation

    Topography, boundaries, and existing conditions captured — by drone where the site calls for it. Everything downstream is drawn on this data.

  2. 02

    Feasibility & design

    Zoning, setbacks, and structural approach resolved before drafting begins, so the plan set is drawn once, not redrawn.

  3. 03

    Construction drawings

    Architectural and structural sheets drafted in-house to the submitting jurisdiction's checklist.

  4. 04

    Submittal & plan check

    We submit, track, and respond to correction letters directly — the drafter who drew the sheet answers the comment on it.

  5. 05

    Permit issued

    With the permit in hand, the same firm that engineered the project prices and builds it. No re-bidding, no translation loss.